
Sprinkler pipework
Pipe requirements for sprinkler distribution lines, matched to the specified diameters, walls and joining method.
A fire-protection pipe inquiry starts with the approved system drawings and material schedule. Regan Industrial Sales, Inc. can review the specified steel pipes and support materials, together with the documents your project requires.
Request a Quote

Pipe requirements for sprinkler distribution lines, matched to the specified diameters, walls and joining method.

Riser and standpipe pipework with its own specified dimensions and document requirements.

Steel sections for support assemblies identified in the project drawings.


Loading and transport coordination for steel orders. Arrangements depend on the order and destination.
View LogisticsSend the pipe schedule and relevant drawing references with:
We’ll check the requested material and documentation before confirming what can be offered.
Send the listings and document requirements in your project specification so our team can check the proposed pipe. Material testing information alone does not establish approval for the fire system.
Have the project’s responsible designer review the proposed material and documents before accepting a change to the specified pipe.
Share the specified pipe list and required documents with our team.